Disclaimer: All articles and resources published in the  Pittsburgh Design & Engineering Services LLC, "PittDES" Structural Engineering Blog are provided for general educational purposes only. They do not constitute project-specific engineering advice, an assessment, design, report, or determination of structural safety or code compliance. Conditions and applicable requirements vary, and concealed conditions may exist. Reading this blog or contacting PittDES does not create an engineer-client relationship; professional services are provided only under an executed written agreement defining the applicable scope and limitations.

Writer: Firas Abdelahad
Firas Abdelahad
Oct 17, 2022
3 min read

Updated: Nov 9

I will be discussing some of the recommendation as published in DCA6-2015 (Prescriptive Residential Wood, Deck Construction Guide based on 2015 International Residential Code). This write up is in no way meant to summarize DCA6-2015.

I am not reproducing the document but rather I am highlighting some of the information in it in efforts to make more people aware of such a great resource (free) that is available at everyone fingertips DCA6-2015


Engineers are trained to interpret codes, standards and other requirements of the local jurisdiction, also to use their best engineering judgement, training and education when reliable sources aren't available.


In the pictures below information provided to help builders and home owners determine decks maximum joist spans and overhangs. There are a lot of information available to help people get their projects built, and some of it just free like DCA6 2015.


Table 2: Maximum Joint Spans and Overhangs shows various wood species' allowable spans and overhangs.
Diagram shows joists, ledger board, and beam; Joist Span - maximum overhang, blocking. See Table 2.
Figure 1B: Joist Span - Joists Attached, Prescriptive Residential Wood Deck Construction Guide.

Diagram of Joist Span - Non-Ledger Deck, including optional overhang, posts, and beam.


In the pictures below information provided to help builders and home owners determine decks’ maximum Beam Spans and overhangs also joist-to-beam connection detail as well as beam assembly detail.



Table 3A: Dimension Lumber Deck Beam Spans, supporting joints with or without overhang.

Residential wood deck construction guide with beam spans and load data.

Beam span diagram with text, beam, post, overhang, American Wood Council.

Joint-to-beam detail shows options for mechanical fasteners, see manufacturer's recommendations; Deck's Requirements Per DCA6-2015

Beam Assembly Details illustration showing 10d threaded nails and screws, DCA6-2015 requirements.



In the 2 figures below, I am sharing the recommended post to beam attachment requirements as noted in DCA6-2015.



Post-to-Beam Attachment Requirements diagram shows 2

Figure 8B: Alternate Approved Post-to-Beam Post Cap Attachment, Solid beam, 6x6 post.




This attachment below is an example of a prohibited post to beam attachment per DCA6-2015. It is important to note that per the article published in the Structure Magazine in April 17th and written by John Showalter, P.E. And Loren Ross, P.E. (Residential Wood Deck Design, https://www.structuremag.org/?p=11302 ).

They do state that" It is important to note that prohibiting attachment of the beam to the sides of the post with fasteners only ensures wood -to-wood bearing. The design of fasteners for wet-services conditions requires significant capacity reductions and should be evaluated by a design professional" Based on this statement a more detailed and maybe lengthy calculations would be required to determine whether this indicated attachment satisfy minimum code and engineering requirements or not. For many people avoiding that engineering expense would just simply to comply with the prescriptive code and eliminate such connection.


Prohibited post-to-beam attachment condition. Through-bolts, lag screws, or nails are prohibited.



In the Figures below you will see a few recommended attachment of ledger board to band joist/rim joist and to foundation wall, also you will see the prohibited attachment per DCA6-2015



Diagram of ledger board attachments to a beam, with detailed dimensions


Diagrams from Prescriptive Residential Wood Deck Construction Guide show prohibited ledger attachments.


Typical foundation options also discussed in DCA6-2015 as shown in the figure below


Diagram shows Typical Footing Options; footing depth, posts, and gravel shown in detail.




Below you will see an example guard detail so builders and home owners can determine Guard Requirements for all decks that are 30" above grade.



Diagram of guard detail with text: 36" minimum, 6'0" max spacing, Deck's Requirements Per DCA6-2015.


Examples of Guard Post attachments for required guard are shown in the few pictures below.


Guard post attachments diagram with text, Deck guard post requirements per DCA6-2015.


Diagram: Guard post to rim joint example, with hold-down anchors and rim posts.

Pictures below Explain stair & stair stringer requirements also show tread connection, stair guard requirements and stair stringer attachment detail.



Stair requirements, detail from DCA6-2015, tread and riser dimension, and text.

Stair stringer and tread diagrams, including requirements per DCA6-2015 for construction guidance.

Diagrams detail stair guard, stringer attachment, and tread size requirements per DCA6-2015


I hope I was able to provide some highlights for this great document, DCA6-2015. Also refer back to IRC and IBC for any additional information that is necessary and not discussed in DCA6.


Call us today if you need any further assistance: 724-949-0004

www.pittdes.com


Written by Firas Abdelahad, P.E.

Firas Abdelahad has been a practicing structural engineer since 2005, collaborating with a diverse range of professionals, including consultants, architects, investors, homeowners, contractors, and subcontractors. Together, they tackle the various challenges that can arise during the design and construction phases of projects.


Disclaimer: PittDES blog content is provided for general educational purposes only and does not constitute project-specific engineering advice, an assessment, design, report, or determination of structural safety or code compliance. Conditions and applicable requirements vary, concealed conditions may exist, and no engineer-client relationship is created without an executed written agreement defining the applicable scope and limitations.

This article may not be reproduced, republished, distributed, modified, or used in whole or in part for commercial purposes without prior written permission from Pittsburgh Design & Engineering Services. Proper attribution with a direct link to the original publication is required for any authorized reference or quotation.





 
 
 